– Specify each load (lighting circuit, socket outlet, heat pump). The software prompts for power (kW), cable length, and installation method.
– Drag the main incomer (e.g., a load break switch). Then add feeder lines, each protected by a miniature circuit breaker (MCB). hager planungssoftware elcom 51
– Define voltage levels (230/400V AC), frequency, and applicable standards (VDE 0100, IEC 60364). – Specify each load (lighting circuit, socket outlet,
In the world of professional electrical installation and building automation, precision is not a luxury—it is a necessity. For engineers, electrical planners, and system integrators working with Hager components, the bridge between a theoretical design and a functional, error-free installation is often software. At the heart of this ecosystem lies a specific, powerful tool: Hager Planungssoftware elcom 51 . Then add feeder lines, each protected by a
– elcom 51 suggests the correct Hager MCB (B, C, or K characteristic) and cable cross-section based on your inputs.
– Drag a residual current device (e.g., Hager CD 4/63/0.03) and connect multiple MCBs downstream. The software checks selectivity and total leakage current.