Maharashtra - Pwd Dsr 2015-16

| Item Description | Unit | Rate (Pune District) – 2015-16 | Remarks | |---|---|---|---| | Excavation in ordinary soil (depth up to 1.5m) | cum | ₹ 85 – ₹ 110 | Manual or mechanical as per clause | | Providing PCC 1:4:8 (40mm aggregate) | cum | ₹ 3,200 – ₹ 3,500 | Including cost of materials and curing | | RCC M20 grade (1:1.5:3) with steel reinforcement | cum | ₹ 5,800 – ₹ 6,200 | Excluding cost of steel | | Reinforcement steel (Fe 500) | MT | ₹ 48,000 – ₹ 52,000 | Including cutting, bending, binding | | Brick masonry in CM 1:6 (common burnt clay bricks) | cum | ₹ 4,500 – ₹ 5,000 | Including scaffolding | | Plaster 12mm thick 1:4 (cement:sand) | sqm | ₹ 85 – ₹ 105 | Smooth finish | | Granular Sub-Base (GSB) | cum | ₹ 650 – ₹ 750 | Including watering and rolling | | Bituminous Concrete (BC) with 60/70 grade bitumen | MT | ₹ 7,500 – ₹ 8,200 | Includes hot mixing and laying | | Whitewashing / Color washing (two coats) | sqm | ₹ 18 – ₹ 25 | Including surface preparation |

| Component | DSR 2015-16 (Pune) | DSR 2022-23 (Pune) | % Increase | |---|---|---|---| | RCC M20 (cum) | ₹ 5,800 | ₹ 8,200 | ~41% | | Reinforcement steel (MT) | ₹ 50,000 | ₹ 70,000 (with fluctuations) | ~40% | | Bituminous Concrete (MT) | ₹ 7,800 | ₹ 11,500 | ~47% | | Plaster 12mm (sqm) | ₹ 95 | ₹ 165 | ~73% | Pwd Dsr 2015-16 Maharashtra

For government engineers, it is a tool for fair assessment of old works. For contractors, it is a shield against unjust deductions in final bills. For students, it is a textbook example of how rate analysis is performed. | Item Description | Unit | Rate (Pune

The remains a landmark document, even years after its release. While the department periodically updates these rates, the 2015-16 edition continues to be a critical reference point for legacy projects, arbitration cases, cost escalation clauses, and understanding base-level pricing for civil works in the state. The remains a landmark document, even years after